Recommended assembly method


1.
Install at ambient temperatures above +10° C on clean surfaces
2. Apply adequate MKK adhesive to the underside of the hanger
  


3. Position the hanger and press until the adhesive seeps through perforations


4. After 5 minutes, the strength of adherence is sufficient for impaling the insulation on the hangers. Maximum strength of adherence is achieved after 24 hours
 
 


5. Secure with CL-2 fastening clips


6. If necessary cover the pin with a protective nylon cap NSC-27
Back to "GSP perforated base hangers"  Sales program Neoprene adhesive MKK-NEO-310
  